Browse by Author Möhring, Rolf H.
Showing results 1 to 20 of 34
Preview | Issue Date | Title | Author(s) | Editor(s) |
 | 2004 | Acceleration of Shortest Path and Constrained Shortest Path Computation | Köhler, Ekkehard; Möhring, Rolf H.; Schilling, Heiko | - |
 | 1998 | Approximation in stochastic scheduling: The power of LP-based priority policies | Möhring, Rolf H.; Schulz, Andreas S.; Uetz, Marc | - |
 | 2002 | A Case Study in Periodic Timetabling | Liebchen, Christian; Möhring, Rolf H. | - |
 | 2009 | Characterizing the Existence of Potential Functions in Weighted Congestion Games | Harks, Tobias; Klimm, Max; Möhring, Rolf H. | - |
 | 1997 | Complexity and Modeling Aspects of Mesh Refinement into Quadrilaterals | Möhring, Rolf H.; Müller-Hannemann, Matthias | - |
 | 1998 | A computational study on bounding the makespan distribution in stochastic project networks | Ludwig, Arfst; Möhring, Rolf H.; Stork, Frederik | - |
 | 2004 | Conflict-free Real-time AGV Routing | Möhring, Rolf H.; Köhler, Ekkehard; Gawrilow, Ewgenij; Stenzel, Björn | - |
 | 2010 | A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling | Berthold, Timo; Heinz, Stefan; Lübbecke, Marco E.; Möhring, Rolf H.; Schulz, Jens | - |
 | 2009 | Decision Support and Optimization in Shutdown and Turnaround Scheduling | Megow, Nicole; Möhring, Rolf H.; Schulz, Jens | - |
 | 2007 | Dynamic Routing of Automated Guided Vehicles in Real-time | Gawrilow, Ewgenij; Köhler, Ekkehard; Möhring, Rolf H.; Stenzel, Björn | - |
 | 1999 | Forcing Relations for AND/OR Precedence Constraints | Möhring, Rolf H.; Skutella, Martin; Stork, Frederik | - |
 | 2003 | Information on MIPLIB's timetab-instances | Liebchen, Christian; Möhring, Rolf H. | - |
 | 1998 | Linear preselective policies for stochastic project scheduling | Möhring, Rolf H.; Stork, Frederik | - |
 | 2004 | Minimizing Total Delay in Fixed-Time Controlled Traffic Networks | Köhler, Ekkehard; Möhring, Rolf H.; Wünsch, Gregor | - |
 | 2004 | The Modeling Power of the Periodic Event Scheduling Problem: Railway Timetables - and Beyond | Liebchen, Christian; Möhring, Rolf H. | - |
 | 2000 | On Project Scheduling with Irregular Starting Time Costs | Möhring, Rolf H.; Schulz, Andreas S.; Stork, Frederik; Uetz, Marc | - |
 | 2006 | Optimal Route Assignment in Large Scale Micro-Simulations | Balmer, Michael; Edelhoff, Torben; Möhring, Rolf H.; Schilling, Heiko | - |
 | 1999 | Optimal Routing of Traffic Flows with Length Restrictions in Networks with Congestion | Jahn, Olaf; Möhring, Rolf H.; Schulz, Andreas S. | - |
 | 2005 | Partitioning Graphs to Speed Up Dijkstra's Algorithm | Möhring, Rolf H.; Schilling, Heiko; Schütz, Birk; Wagner, Dorothea; Willhalm, Thomas | - |
 | 1998 | Resource constrained project scheduling with time windows: A branching scheme based on dynamic release dates | Fest, Andreas; Möhring, Rolf H.; Stork, Frederik; Uetz, Marc | - |