Please use this identifier to cite or link to this item: http://dx.doi.org/10.14279/depositonce-14474
For citation please use:
Main Title: A Constraint Integer Programming Approach for Resource-Constrained Project Scheduling
Author(s): Berthold, Timo
Heinz, Stefan
Lübbecke, Marco E.
Möhring, Rolf H.
Schulz, Jens
Type: Research Paper
URI: https://depositonce.tu-berlin.de/handle/11303/15701
http://dx.doi.org/10.14279/depositonce-14474
License: http://rightsstatements.org/vocab/InC/1.0/
Abstract: We propose a hybrid approach for solving the resource-constrained project scheduling problem which is an extremely hard to solve combinatorial optimization problem of practical relevance. Jobs have to be scheduled on (renewable) resources subject to precedence constraints such that the resource capacities are never exceeded and the latest completion time of all jobs is minimized.
Subject(s): scheduling
resource-constrained
constraint integer programming
hybrid approach
Issue Date: 2010
Date Available: 17-Dec-2021
Language Code: en
DDC Class: 510 Mathematik
Series: Preprint-Reihe des Instituts für Mathematik, Technische Universität Berlin
Series Number: 2010, 03
ISSN: 2197-8085
TU Affiliation(s): Fak. 2 Mathematik und Naturwissenschaften » Inst. Mathematik
Appears in Collections:Technische Universität Berlin » Publications

Files in This Item:
Report-003-2010.pdf
Format: Adobe PDF | Size: 373.32 kB
DownloadShow Preview
Thumbnail

Item Export Bar

Items in DepositOnce are protected by copyright, with all rights reserved, unless otherwise indicated.