Main Title: Scheduling under uncertainty: Bounding the makespan distribution
Author(s): Möhring, Rolf H.
Type: Research Paper
URI: https://depositonce.tu-berlin.de/handle/11303/15950
http://dx.doi.org/10.14279/depositonce-14723
License: http://rightsstatements.org/vocab/InC/1.0/
Abstract: Deterministic models for project scheduling and control suffer from the fact that they assume complete information and neglect random influences that occur during project execution. A typical consequence is the underestimation of the expected project duration and cost frequently observed in practice. This phenomenon occurs even in the absence of resource constraints, and has been the subject of extensive research in discrete mathematics and operations research.
Subject(s): uncertainty
scheduling
makespan distribution function
stochastic bounds
project planning
Issue Date: 2000
Date Available: 17-Dec-2021
Language Code: en
DDC Class: 510 Mathematik
MSC 2000: 90B36 Scheduling theory, stochastic
90B35 Scheduling theory, deterministic
68M20 Performance evaluation; queueing; scheduling
Series: Preprint-Reihe des Instituts für Mathematik, Technische Universität Berlin
Series Number: 2000, 700
ISSN: 2197-8085
TU Affiliation(s): Fak. 2 Mathematik und Naturwissenschaften » Inst. Mathematik
Appears in Collections:Technische Universität Berlin » Publications

Files in This Item:
Report-700-2000.pdf
Format: Adobe PDF | Size: 411.05 kB
DownloadShow Preview
Thumbnail
Report-700-2000.ps.gz
Format: Unknown | Size: 198.99 kB
Download

Item Export Bar

Items in DepositOnce are protected by copyright, with all rights reserved, unless otherwise indicated.